Standard Allowed Minute
(SAM) Module
Standard Allowed Minutes (SAM) is a term used in manufacturing and production planning. It refers to the amount of time considered necessary for completing a particular task or operation on a production line. SAM is a key metric used in time and motion studies to estimate the time required for completing various tasks within the production process.
The SAM is calculated based on various factors such as the complexity of the task, the skill level of the worker, the machinery being used, and any other relevant variables. It helps in estimating the time required for manufacturing a product, scheduling production activities, and optimizing production efficiency.
NumlaTex provides standard allowed minutes module which can be utilized in various functionalities such as creating manufacturing orders, scheduling work centers, managing work orders, and analyzing production performance.
By determining SAM values for various operations, textile manufacturers can:
- Improve production planning and scheduling.
- Set realistic production targets.
- Identify inefficiencies in the production process.
- Standardize work processes.
- Estimate labor costs accurately.
Key Factors:
Type of Operation:
Different operations within textile manufacturing, such as cutting, sewing, finishing, etc., have varying complexity levels and thus different SAM values.
Skill Level of Workers
The proficiency and experience of the workers performing the task impact the time required. Skilled workers might complete tasks more efficiently than those who are less experienced.
Equipment and Machinery
The type and condition of machinery and equipment used in the process can affect the time required for completing tasks.
Workplace Environment
Factors such as ergonomics, workspace layout, and organizational efficiency can also impact the time taken to perform tasks.